================================================================ DRAFT SUPERVISORY-FEEDBACK NOTE - TEMPLATE A draft for a supervisor to review, adapt and (if it chooses) issue. SYNTHETIC / FICTIONAL SAMPLE - this is NOT a communication from the Bank of Ghana, and no real institution is represented. ================================================================ [Draft to: The Chief Risk Officer, Absa Bank Ghana LTD] Reporting period: 2026 H1 Supervisory status: RED Reference: Climate-Related Financial Risk Directive, 2024 (Para 48 physical-risk section) Dear Sir/Madam, Following our review of your climate-related financial risk submission, run on the common supervisory method and parameter set, we note the following: 1. [Action required] (Evidence gating (Para 33(c))) Unverified adaptation pipeline: the bank has declared resilience measures that are not yet evidence-accepted. Crediting them would cut High+ from 17% to 5% (-12pp); the filed figure correctly withholds that credit. Require site/as-built evidence before it counts. Recommended adaptation measures (by the hazard driving each High+ asset): - Improved drainage + raised plinth (elevation) - 4 asset(s), ~GHS 2,755,000 exposure (driver: Flood). - Watercourse setback + drainage / elevation - 2 asset(s), ~GHS 2,042,000 exposure (driver: Riparian proximity). - Cool or green roof - 2 asset(s), ~GHS 1,392,000 exposure (driver: Extreme heat). - On-site water retention / storage - 2 asset(s), ~GHS 976,000 exposure (driver: Drought / water stress). Required actions: - Provide, within 30 days, the drivers of the above and your board-approved mitigation plan with timelines. - Where the submission relies on self-reported adaptation, submit site-inspection / as-built evidence before the risk reduction is recognised in your return. - Reflect the above in your next ICAAP and semi-annual return. This draft is intended to support compliance with the Directive and does not, of itself, constitute a capital or enforcement measure. [For issue by the Bank of Ghana, Climate & Sustainability Office, on official letterhead.] Prepared by the PortfolioCheck supervisor console - 2026-08-23 ---------------------------------------------------------------- SYNTHETIC / FICTIONAL SAMPLE - not an actual Bank of Ghana communication. ----------------------------------------------------------------