PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Guaranty Trust Bank (Ghana) LTD GREEN

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▼ -9pp across the submitted periods.

Peer comparison: ranked #21 of 23 by % High+ (highest = most exposed), and 10.3pp below the system average of 19.3%.

Regulator-scoped view. Only Guaranty Trust Bank (Ghana) LTD's synthetic assets are loaded below. Open institution-side dashboard →
GHS 60.07MBook exposure (115 assets)
9.0%at High+ (bank submission)
9.0%if declared adaptation were evidenced
GHS 61kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H118.1%GHS 60.07MGHS 10.86M
2025 H212.9%GHS 60.07MGHS 7.76M
2026 H19.0%GHS 60.07MGHS 5.38M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
9.0%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
9.0%

On the supervisor's adaptation-evidence cross-check the bank is making no claim on unverified adaptation — its filed figure is already fully evidence-based.

High+ exposure by region

AshantiGHS 2.39M
Greater AccraGHS 1.04M
Upper EastGHS 1.01M
North EastGHS 937k

High+ exposure by hazard

Extreme heatGHS 4.19M
FloodGHS 3.44M
Drought / water stressGHS 1.95M
Riparian proximityGHS 1.59M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)4GHS 2.87MFlood
Cool or green roof6GHS 1.01MExtreme heat
On-site water retention / storage4GHS 937kDrought / water stress
Watercourse setback + drainage / elevation2GHS 564kRiparian proximity

Supervisory action

Status GREEN. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.