PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

OmniBSIC Bank Ghana LTD RED

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▼ -1pp across the submitted periods.

Peer comparison: ranked #13 of 23 by % High+ (highest = most exposed), and in line with the system average of 16.2%.

Regulator-scoped view. Only OmniBSIC Bank Ghana LTD's synthetic assets are loaded below. Open institution-side dashboard →
GHS 22.74MBook exposure (42 assets)
15.9%at High+ (bank submission)
6.1%if declared adaptation were evidenced
GHS 57kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H116.9%GHS 21.45MGHS 3.62M
2025 H216.7%GHS 21.72MGHS 3.62M
2026 H115.9%GHS 22.74MGHS 3.62M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
15.9%
IF SELF-REPORTED CLAIMS WERE CREDITED
6.1%

On the supervisor's adaptation-evidence cross-check the bank is carrying −9.8pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 15.9% to 6.1%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

CentralGHS 1.13M
North EastGHS 731k
Upper EastGHS 649k
AshantiGHS 506k
Greater AccraGHS 400k
WesternGHS 202k

High+ exposure by hazard

Extreme heatGHS 1.67M
Drought / water stressGHS 1.38M
Coastal / sea-levelGHS 1.34M
FloodGHS 906k
Riparian proximityGHS 506k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
On-site water retention / storage4GHS 1.38MDrought / water stress
Coastal / sea defence + elevation2GHS 1.34MCoastal / sea-level
Improved drainage + raised plinth (elevation)3GHS 685kFlood
Watercourse setback + drainage / elevation1GHS 221kRiparian proximity

Supervisory action

Status RED. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.