PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Prudential Bank Limited AMBER

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▼ -12pp across the submitted periods.

Peer comparison: ranked #6 of 23 by % High+ (highest = most exposed), and +3.9pp above the system average of 19.3%.

Regulator-scoped view. Only Prudential Bank Limited's synthetic assets are loaded below. Open institution-side dashboard →
GHS 34.75MBook exposure (100 assets)
23.2%at High+ (bank submission)
23.2%if declared adaptation were evidenced
GHS 31kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H135.5%GHS 34.75MGHS 12.32M
2025 H220.5%GHS 34.75MGHS 7.11M
2026 H123.2%GHS 34.75MGHS 8.06M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
23.2%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
23.2%

On the supervisor's adaptation-evidence cross-check the bank is making no claim on unverified adaptation — its filed figure is already fully evidence-based.

High+ exposure by region

NorthernGHS 2.58M
AshantiGHS 1.69M
Upper EastGHS 1.40M
Upper WestGHS 1.21M
North EastGHS 632k
WesternGHS 430k
CentralGHS 125k

High+ exposure by hazard

Extreme heatGHS 6.52M
Drought / water stressGHS 3.24M
Riparian proximityGHS 1.97M
FloodGHS 1.69M
Coastal / sea-levelGHS 555k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof17GHS 5.19MExtreme heat
Watercourse setback + drainage / elevation1GHS 984kRiparian proximity
Improved drainage + raised plinth (elevation)1GHS 704kFlood
On-site water retention / storage5GHS 632kDrought / water stress
Coastal / sea defence + elevation2GHS 555kCoastal / sea-level

Supervisory action

Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.