PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Societe General Ghana Plc AMBER

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #3 of 23 by % High+ (highest = most exposed), and +14.2pp above the system average of 19.3%.

Regulator-scoped view. Only Societe General Ghana Plc's synthetic assets are loaded below. Open institution-side dashboard →
GHS 58.94MBook exposure (121 assets)
33.5%at High+ (bank submission)
30.9%if declared adaptation were evidenced
GHS 97kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H134.0%GHS 54.72MGHS 18.61M
2025 H235.0%GHS 55.72MGHS 19.48M
2026 H133.5%GHS 58.94MGHS 19.74M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
33.5%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
30.9%

On the supervisor's adaptation-evidence cross-check the bank is carrying −2.6pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 33.5% to 30.9%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

AshantiGHS 6.29M
Greater AccraGHS 4.16M
NorthernGHS 3.50M
Upper WestGHS 2.80M
Upper EastGHS 1.74M
North EastGHS 763k
OtiGHS 485k

High+ exposure by hazard

Extreme heatGHS 14.80M
FloodGHS 10.45M
Drought / water stressGHS 5.30M
Riparian proximityGHS 5.19M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof22GHS 8.04MExtreme heat
Improved drainage + raised plinth (elevation)15GHS 7.21MFlood
Watercourse setback + drainage / elevation5GHS 3.73MRiparian proximity
On-site water retention / storage5GHS 763kDrought / water stress

Supervisory action

Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.