Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▲ +3pp across the submitted periods.
Peer comparison: ranked #6 of 23 by % High+ (highest = most exposed), and +8.1pp above the system average of 16.2%.
| Period | % High+ | Exposure | High+ exposure |
|---|---|---|---|
| 2025 H1 | 21.2% | GHS 20.93M | GHS 4.44M |
| 2025 H2 | 21.8% | GHS 21.09M | GHS 4.60M |
| 2026 H1 | 24.3% | GHS 21.79M | GHS 5.30M |
On the supervisor's adaptation-evidence cross-check the bank is carrying −1.1pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 24.3% to 23.2%. That credit stays withheld until site/as-built evidence is accepted.
The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.
Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.
| Measure | Assets | Exposure | Hazard driver |
|---|---|---|---|
| Improved drainage + raised plinth (elevation) | 6 | GHS 2.93M | Flood |
| Watercourse setback + drainage / elevation | 2 | GHS 1.73M | Riparian proximity |
| Cool or green roof | 3 | GHS 647k | Extreme heat |
Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.
Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓