PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Agricultural Development Bank Plc AMBER

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #10 of 23 by % High+ (highest = most exposed), and +2.1pp above the system average of 19.3%.

Regulator-scoped view. Only Agricultural Development Bank Plc's synthetic assets are loaded below. Open institution-side dashboard →
GHS 103.99MBook exposure (165 assets)
21.4%at High+ (bank submission)
17.4%if declared adaptation were evidenced
GHS 205kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H121.4%GHS 95.91MGHS 20.50M
2025 H222.1%GHS 100.37MGHS 22.21M
2026 H121.4%GHS 103.99MGHS 22.21M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
21.4%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
17.4%

On the supervisor's adaptation-evidence cross-check the bank is carrying −4.0pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 21.4% to 17.4%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

AshantiGHS 7.51M
Greater AccraGHS 5.24M
NorthernGHS 2.85M
WesternGHS 2.36M
Upper EastGHS 1.77M
North EastGHS 1.28M
Upper WestGHS 991k
CentralGHS 210k

High+ exposure by hazard

FloodGHS 14.60M
Extreme heatGHS 12.08M
Riparian proximityGHS 7.07M
Drought / water stressGHS 4.04M
Coastal / sea-levelGHS 2.57M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)11GHS 10.31MFlood
Cool or green roof13GHS 5.19MExtreme heat
Coastal / sea defence + elevation5GHS 2.57MCoastal / sea-level
Watercourse setback + drainage / elevation4GHS 2.44MRiparian proximity
On-site water retention / storage6GHS 1.70MDrought / water stress

Supervisory action

Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.