PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Zenith Bank (Ghana) Limited AMBER

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #11 of 23 by % High+ (highest = most exposed), and +1.7pp above the system average of 19.3%.

Regulator-scoped view. Only Zenith Bank (Ghana) Limited's synthetic assets are loaded below. Open institution-side dashboard →
GHS 117.26MBook exposure (145 assets)
21.0%at High+ (bank submission)
18.9%if declared adaptation were evidenced
GHS 194kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H121.0%GHS 117.26MGHS 24.67M
2025 H221.0%GHS 117.26MGHS 24.67M
2026 H121.0%GHS 117.26MGHS 24.67M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
21.0%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
18.9%

On the supervisor's adaptation-evidence cross-check the bank is carrying −2.1pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 21.0% to 18.9%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

AshantiGHS 8.21M
Greater AccraGHS 5.24M
WesternGHS 3.74M
NorthernGHS 2.86M
Upper WestGHS 1.82M
CentralGHS 1.77M
Upper EastGHS 775k
North EastGHS 249k

High+ exposure by hazard

FloodGHS 15.90M
Extreme heatGHS 12.74M
Coastal / sea-levelGHS 6.18M
Riparian proximityGHS 5.33M
Drought / water stressGHS 2.85M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)11GHS 8.12MFlood
Coastal / sea defence + elevation9GHS 5.52MCoastal / sea-level
Cool or green roof10GHS 5.46MExtreme heat
Watercourse setback + drainage / elevation8GHS 5.33MRiparian proximity
On-site water retention / storage2GHS 249kDrought / water stress

Supervisory action

Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.