PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

GCB Bank Plc AMBER

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▼ -1pp across the submitted periods.

Peer comparison: ranked #5 of 23 by % High+ (highest = most exposed), and +8.9pp above the system average of 19.3%.

Regulator-scoped view. Only GCB Bank Plc's synthetic assets are loaded below. Open institution-side dashboard →
GHS 108.87MBook exposure (192 assets)
28.2%at High+ (bank submission)
26.7%if declared adaptation were evidenced
GHS 79kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H129.1%GHS 103.64MGHS 30.11M
2025 H229.3%GHS 104.78MGHS 30.73M
2026 H128.2%GHS 108.87MGHS 30.73M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
28.2%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
26.7%

On the supervisor's adaptation-evidence cross-check the bank is carrying −1.5pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 28.2% to 26.7%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

Upper EastGHS 9.77M
North EastGHS 7.01M
NorthernGHS 6.52M
Upper WestGHS 4.50M
Greater AccraGHS 1.96M
AshantiGHS 840k
OtiGHS 127k

High+ exposure by hazard

Extreme heatGHS 28.65M
Drought / water stressGHS 21.28M
FloodGHS 2.80M
Riparian proximityGHS 1.58M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof40GHS 20.52MExtreme heat
On-site water retention / storage23GHS 7.28MDrought / water stress
Improved drainage + raised plinth (elevation)4GHS 2.80MFlood
Watercourse setback + drainage / elevation1GHS 127kRiparian proximity

Supervisory action

Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.