PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Republic Bank (Ghana) PLC GREEN

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #18 of 23 by % High+ (highest = most exposed), and 5.8pp below the system average of 16.2%.

Regulator-scoped view. Only Republic Bank (Ghana) PLC's synthetic assets are loaded below. Open institution-side dashboard →
GHS 25.78MBook exposure (44 assets)
10.4%at High+ (bank submission)
9.4%if declared adaptation were evidenced
GHS 41kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H110.4%GHS 25.78MGHS 2.67M
2025 H210.4%GHS 25.78MGHS 2.67M
2026 H110.4%GHS 25.78MGHS 2.67M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
10.4%
IF SELF-REPORTED CLAIMS WERE CREDITED
9.4%

On the supervisor's adaptation-evidence cross-check the bank is carrying −1.0pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 10.4% to 9.4%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

Greater AccraGHS 1.26M
NorthernGHS 936k
AshantiGHS 478k

High+ exposure by hazard

FloodGHS 1.74M
Extreme heatGHS 1.17M
Riparian proximityGHS 478k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)4GHS 1.51MFlood
Cool or green roof1GHS 936kExtreme heat
Watercourse setback + drainage / elevation1GHS 230kRiparian proximity

Supervisory action

Status GREEN. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.