PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Republic Bank (Ghana) PLC GREEN

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #18 of 23 by % High+ (highest = most exposed), and 4.5pp below the system average of 19.3%.

Regulator-scoped view. Only Republic Bank (Ghana) PLC's synthetic assets are loaded below. Open institution-side dashboard →
GHS 72.94MBook exposure (120 assets)
14.8%at High+ (bank submission)
12.8%if declared adaptation were evidenced
GHS 99kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H114.8%GHS 72.94MGHS 10.79M
2025 H214.8%GHS 72.94MGHS 10.79M
2026 H114.8%GHS 72.94MGHS 10.79M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
14.8%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
12.8%

On the supervisor's adaptation-evidence cross-check the bank is carrying −2.0pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 14.8% to 12.8%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

Greater AccraGHS 4.54M
AshantiGHS 2.93M
CentralGHS 1.16M
NorthernGHS 1.15M
Upper WestGHS 428k
North EastGHS 296k
WesternGHS 284k

High+ exposure by hazard

FloodGHS 7.75M
Extreme heatGHS 3.56M
Riparian proximityGHS 2.93M
Coastal / sea-levelGHS 1.45M
Drought / water stressGHS 724k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)10GHS 4.79MFlood
Watercourse setback + drainage / elevation5GHS 2.68MRiparian proximity
Cool or green roof5GHS 1.58MExtreme heat
Coastal / sea defence + elevation3GHS 1.45MCoastal / sea-level
On-site water retention / storage1GHS 296kDrought / water stress

Supervisory action

Status GREEN. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.