PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Stanbic Bank Ghana Limited GREEN

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▼ -3pp across the submitted periods.

Peer comparison: ranked #22 of 23 by % High+ (highest = most exposed), and 12.1pp below the system average of 19.3%.

Regulator-scoped view. Only Stanbic Bank Ghana Limited's synthetic assets are loaded below. Open institution-side dashboard →
GHS 123.08MBook exposure (160 assets)
7.2%at High+ (bank submission)
7.2%if declared adaptation were evidenced
GHS 111kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H110.6%GHS 123.08MGHS 13.03M
2025 H26.9%GHS 123.08MGHS 8.50M
2026 H17.2%GHS 123.08MGHS 8.80M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
7.2%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
7.2%

On the supervisor's adaptation-evidence cross-check the bank is making no claim on unverified adaptation — its filed figure is already fully evidence-based.

High+ exposure by region

Greater AccraGHS 2.24M
North EastGHS 1.84M
WesternGHS 1.58M
Upper WestGHS 1.11M
AshantiGHS 909k
Upper EastGHS 657k
CentralGHS 465k

High+ exposure by hazard

FloodGHS 4.42M
Extreme heatGHS 4.26M
Drought / water stressGHS 3.61M
Coastal / sea-levelGHS 2.05M
Riparian proximityGHS 909k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)5GHS 2.86MFlood
Coastal / sea defence + elevation3GHS 2.05MCoastal / sea-level
On-site water retention / storage7GHS 1.84MDrought / water stress
Cool or green roof5GHS 1.77MExtreme heat
Watercourse setback + drainage / elevation1GHS 288kRiparian proximity

Supervisory action

Status GREEN. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.