PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Standard Chartered Bank Ghana Plc RED

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #1 of 23 by % High+ (highest = most exposed), and +16.5pp above the system average of 19.3%.

Regulator-scoped view. Only Standard Chartered Bank Ghana Plc's synthetic assets are loaded below. Open institution-side dashboard →
GHS 79.96MBook exposure (150 assets)
35.8%at High+ (bank submission)
33.4%if declared adaptation were evidenced
GHS 70kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H135.8%GHS 79.96MGHS 28.63M
2025 H235.8%GHS 79.96MGHS 28.63M
2026 H135.8%GHS 79.96MGHS 28.63M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
35.8%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
33.4%

On the supervisor's adaptation-evidence cross-check the bank is carrying −2.4pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 35.8% to 33.4%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

Upper EastGHS 8.31M
NorthernGHS 7.60M
Upper WestGHS 7.36M
North EastGHS 2.86M
Greater AccraGHS 1.64M
AshantiGHS 863k

High+ exposure by hazard

Extreme heatGHS 26.68M
Drought / water stressGHS 18.53M
FloodGHS 2.50M
Riparian proximityGHS 1.67M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof44GHS 21.12MExtreme heat
On-site water retention / storage15GHS 5.01MDrought / water stress
Improved drainage + raised plinth (elevation)4GHS 1.95MFlood
Watercourse setback + drainage / elevation1GHS 554kRiparian proximity

Supervisory action

Status RED. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.