PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

United Bank for Africa (Ghana) Limited AMBER

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▲ +4pp across the submitted periods.

Peer comparison: ranked #1 of 23 by % High+ (highest = most exposed), and +13.0pp above the system average of 16.2%.

Regulator-scoped view. Only United Bank for Africa (Ghana) Limited's synthetic assets are loaded below. Open institution-side dashboard →
GHS 25.61MBook exposure (46 assets)
29.2%at High+ (bank submission)
26.8%if declared adaptation were evidenced
GHS 75kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H125.5%GHS 22.39MGHS 5.72M
2025 H225.2%GHS 24.23MGHS 6.10M
2026 H129.2%GHS 25.61MGHS 7.48M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
29.2%
IF SELF-REPORTED CLAIMS WERE CREDITED
26.8%

On the supervisor's adaptation-evidence cross-check the bank is carrying −2.4pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 29.2% to 26.8%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

Greater AccraGHS 3.12M
NorthernGHS 2.60M
WesternGHS 1.76M

High+ exposure by hazard

FloodGHS 3.95M
Extreme heatGHS 2.60M
Coastal / sea-levelGHS 1.76M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)6GHS 3.12MFlood
Cool or green roof4GHS 2.60MExtreme heat
Coastal / sea defence + elevation2GHS 1.76MCoastal / sea-level

Supervisory action

Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.