Universal Merchant Bank Ghana LTD RED

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #2 of 23 by % High+ (highest = most exposed), and +11.1pp above the system average of 16.2%.

Regulator-scoped view. Only Universal Merchant Bank Ghana LTD's synthetic assets are loaded below. Open institution-side dashboard →
GHS 18.07MBook exposure (38 assets)
27.3%at High+ (bank submission)
12.1%if declared adaptation were evidenced
GHS 33kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H127.3%GHS 18.07MGHS 4.94M
2025 H227.3%GHS 18.07MGHS 4.94M
2026 H127.3%GHS 18.07MGHS 4.94M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
27.3%
IF SELF-REPORTED CLAIMS WERE CREDITED
12.1%

On the supervisor's adaptation-evidence cross-check the bank is carrying −15.2pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 27.3% to 12.1%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

NorthernGHS 2.35M
Upper EastGHS 1.21M
AshantiGHS 1.15M
Greater AccraGHS 237k

High+ exposure by hazard

Extreme heatGHS 4.53M
FloodGHS 1.39M
Drought / water stressGHS 1.21M
Riparian proximityGHS 625k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof4GHS 2.35MExtreme heat
Improved drainage + raised plinth (elevation)3GHS 1.39MFlood
On-site water retention / storage3GHS 1.21MDrought / water stress

Supervisory action

Status RED. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.