PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Consolidated Bank Ghana Limited AMBER

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▼ -1pp across the submitted periods.

Peer comparison: ranked #8 of 23 by % High+ (highest = most exposed), and +3.0pp above the system average of 19.3%.

Regulator-scoped view. Only Consolidated Bank Ghana Limited's synthetic assets are loaded below. Open institution-side dashboard →
GHS 97.19MBook exposure (155 assets)
22.3%at High+ (bank submission)
20.4%if declared adaptation were evidenced
GHS 98kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H123.2%GHS 93.31MGHS 21.64M
2025 H222.5%GHS 96.39MGHS 21.64M
2026 H122.3%GHS 97.19MGHS 21.64M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
22.3%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
20.4%

On the supervisor's adaptation-evidence cross-check the bank is carrying −1.9pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 22.3% to 20.4%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

Upper EastGHS 6.97M
NorthernGHS 3.78M
Upper WestGHS 3.48M
North EastGHS 3.02M
AshantiGHS 2.36M
Greater AccraGHS 1.28M
CentralGHS 754k

High+ exposure by hazard

Extreme heatGHS 18.90M
Drought / water stressGHS 13.47M
FloodGHS 3.64M
Riparian proximityGHS 2.53M
Coastal / sea-levelGHS 754k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof27GHS 14.06MExtreme heat
On-site water retention / storage10GHS 3.20MDrought / water stress
Watercourse setback + drainage / elevation5GHS 2.36MRiparian proximity
Improved drainage + raised plinth (elevation)4GHS 1.28MFlood
Coastal / sea defence + elevation1GHS 754kCoastal / sea-level

Supervisory action

Status AMBER. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.