PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Ecobank Ghana Plc GREEN

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory ▼ -11pp across the submitted periods.

Peer comparison: ranked #23 of 23 by % High+ (highest = most exposed), and 14.4pp below the system average of 19.3%.

Regulator-scoped view. Only Ecobank Ghana Plc's synthetic assets are loaded below. Open institution-side dashboard →
GHS 120.22MBook exposure (175 assets)
4.9%at High+ (bank submission)
4.9%if declared adaptation were evidenced
GHS 96kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H115.5%GHS 120.22MGHS 18.68M
2025 H212.1%GHS 120.22MGHS 14.53M
2026 H14.9%GHS 120.22MGHS 5.92M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
4.9%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
4.9%

On the supervisor's adaptation-evidence cross-check the bank is making no claim on unverified adaptation — its filed figure is already fully evidence-based.

High+ exposure by region

AshantiGHS 1.60M
CentralGHS 1.38M
NorthernGHS 916k
Upper EastGHS 733k
North EastGHS 481k
WesternGHS 399k
Greater AccraGHS 237k
Upper WestGHS 171k

High+ exposure by hazard

Extreme heatGHS 3.33M
FloodGHS 2.24M
Coastal / sea-levelGHS 1.77M
Riparian proximityGHS 1.60M
Drought / water stressGHS 1.39M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof5GHS 1.82MExtreme heat
Coastal / sea defence + elevation2GHS 1.77MCoastal / sea-level
Watercourse setback + drainage / elevation2GHS 1.02MRiparian proximity
Improved drainage + raised plinth (elevation)2GHS 817kFlood
On-site water retention / storage1GHS 481kDrought / water stress

Supervisory action

Status GREEN. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.