PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Fidelity Bank (Ghana) LTD RED

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #2 of 23 by % High+ (highest = most exposed), and +16.0pp above the system average of 19.3%.

Regulator-scoped view. Only Fidelity Bank (Ghana) LTD's synthetic assets are loaded below. Open institution-side dashboard →
GHS 80.90MBook exposure (160 assets)
35.3%at High+ (bank submission)
17.4%if declared adaptation were evidenced
GHS 58kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H135.3%GHS 80.90MGHS 28.58M
2025 H235.3%GHS 80.90MGHS 28.58M
2026 H135.3%GHS 80.90MGHS 28.58M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
35.3%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
17.4%

On the supervisor's adaptation-evidence cross-check the bank is carrying −17.9pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 35.3% to 17.4%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

NorthernGHS 9.93M
Upper WestGHS 6.54M
Upper EastGHS 5.20M
North EastGHS 4.25M
AshantiGHS 1.44M
WesternGHS 991k
Greater AccraGHS 219k

High+ exposure by hazard

Extreme heatGHS 26.79M
Drought / water stressGHS 15.99M
FloodGHS 1.66M
Riparian proximityGHS 1.44M
Coastal / sea-levelGHS 991k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Cool or green roof42GHS 21.12MExtreme heat
On-site water retention / storage16GHS 4.80MDrought / water stress
Watercourse setback + drainage / elevation2GHS 1.44MRiparian proximity
Coastal / sea defence + elevation1GHS 991kCoastal / sea-level
Improved drainage + raised plinth (elevation)1GHS 219kFlood

Supervisory action

Status RED. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.