PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Absa Bank Ghana LTD RED

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #10 of 23 by % High+ (highest = most exposed), and +1.1pp above the system average of 16.2%.

Regulator-scoped view. Only Absa Bank Ghana LTD's synthetic assets are loaded below. Open institution-side dashboard →
GHS 41.38MBook exposure (60 assets)
17.3%at High+ (bank submission)
5.0%if declared adaptation were evidenced
GHS 81kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H117.3%GHS 41.38MGHS 7.17M
2025 H217.3%GHS 41.38MGHS 7.17M
2026 H117.3%GHS 41.38MGHS 7.17M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
17.3%
IF SELF-REPORTED CLAIMS WERE CREDITED
5.0%

On the supervisor's adaptation-evidence cross-check the bank is carrying −12.3pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 17.3% to 5.0%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

AshantiGHS 4.38M
NorthernGHS 1.39M
North EastGHS 490k
Upper EastGHS 486k
Greater AccraGHS 417k

High+ exposure by hazard

Extreme heatGHS 5.30M
FloodGHS 4.80M
Riparian proximityGHS 4.38M
Drought / water stressGHS 976k

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)4GHS 2.75MFlood
Watercourse setback + drainage / elevation2GHS 2.04MRiparian proximity
Cool or green roof2GHS 1.39MExtreme heat
On-site water retention / storage2GHS 976kDrought / water stress

Supervisory action

Status RED. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.