PortfolioCheck · Supervisory review Supervisor console · bank drill-down ← All banks

Absa Bank Ghana LTD RED

Reporting period 2026 H1 · submission channel console (ORASS-ready) · run on the common supervisory method & parameter set. Trajectory — flat across the submitted periods.

Peer comparison: ranked #17 of 23 by % High+ (highest = most exposed), and 4.2pp below the system average of 19.3%.

Regulator-scoped view. Only Absa Bank Ghana LTD's synthetic assets are loaded below. Open institution-side dashboard →
GHS 120.85MBook exposure (160 assets)
15.1%at High+ (bank submission)
4.6%if declared adaptation were evidenced
GHS 129kclimate ECL / yr

Risk trajectory across reporting periods

Period% High+ExposureHigh+ exposure
2025 H115.1%GHS 120.85MGHS 18.21M
2025 H215.1%GHS 120.85MGHS 18.21M
2026 H115.1%GHS 120.85MGHS 18.21M

Supervisor top-down re-run

AS FILED (evidence-accepted adaptation only)
15.1%
→
IF SELF-REPORTED CLAIMS WERE CREDITED
4.6%

On the supervisor's adaptation-evidence cross-check the bank is carrying −10.5pp of unverified adaptation: if its declared-but-unevidenced measures were credited, its High+ share would fall from 15.1% to 4.6%. That credit stays withheld until site/as-built evidence is accepted.

High+ exposure by region

AshantiGHS 7.12M
Greater AccraGHS 2.52M
NorthernGHS 1.97M
WesternGHS 1.95M
Upper EastGHS 1.76M
CentralGHS 1.28M
North EastGHS 1.04M
Upper WestGHS 565k

High+ exposure by hazard

FloodGHS 11.59M
Extreme heatGHS 9.94M
Riparian proximityGHS 7.12M
Drought / water stressGHS 3.37M
Coastal / sea-levelGHS 3.23M

Selected institution — property distribution

The sector dashboard intentionally plots no properties. This map is created only after the regulator selects an institution and contains no other institution's assets.

Supervisory findings

Recommended adaptation measures

Specific measures for this bank's High+ assets, by the hazard driving each. These are attached to any directive issued.

MeasureAssetsExposureHazard driver
Improved drainage + raised plinth (elevation)11GHS 7.33MFlood
Cool or green roof9GHS 4.30MExtreme heat
Coastal / sea defence + elevation5GHS 3.23MCoastal / sea-level
Watercourse setback + drainage / elevation3GHS 2.31MRiparian proximity
On-site water retention / storage3GHS 1.04MDrought / water stress

Supervisory action

Status RED. Prepare a draft directive — a Directive-cited draft is recorded and delivered to the institution's supervisory inbox for review and formal issue.

Download feedback note ↓ Proposed return document (Word) ↓ Physical-risk return data (CSV) ↓
Illustrative — synthetic data. The public institution name is used only to demonstrate navigation. No property, exposure, result or trajectory shown is information about the named institution. Submitted via the demonstration channel; built to route through BoG's ORASS. Institution-owned working document.